• Newsletters
  • Webinars
  • Podcast
  • Reports
  • About
    • Advertising
    • Contact us
    • Team
    • Contributors
  • News
  • Frontline
    • Prevention
    • Resilience
    • Response
    • Recovery
    • Learning
  • Leadership
    • Strategy
    • Government
    • Culture
    • Communication
  • People and skills
    • People moves
    • Training
    • Apprenticeships
    • Diversity and inclusion
    • Mental health and wellbeing
    • Life stages
  • Products
    • PPE
    • Vehicles
    • Medical
    • Training
    • Operational
    • Technology
  • Sustainability
    • Infrastructure
    • Transport
    • Built environment
    • Net zero
    • Climate change
  • Technology
    • Command and control
    • Data
    • Hardware
    • Software and apps
    • Digital transformation
    • Mapping and navigation
X (Twitter) LinkedIn Instagram
  • Newsletters
  • Webinars
  • Podcast
  • Reports
  • About
    • Advertising
    • Contact us
    • Team
    • Contributors
LinkedIn Instagram
Emergency Services Times
  • News
  • Frontline
  • Leadership
  • People and skills
  • Products
  • Sustainability
  • Technology
Emergency Services Times
Home > Sustainability > Firefighters to benefit from advanced training at new facility for challenging buildings
Sustainability 22 August 2024

Firefighters to benefit from advanced training at new facility for challenging buildings

22 August 2024No Comments3 Mins Read
Photo credit: Kent FRS
Photo credit: Kent FRS

Work to build a real fire training facility at Ashford fire station has begun and is set to be completed in December 2025. The site, that’s been designed with sustainability at the centre, will provide Kent fire crews with an advanced and realistic high-rise environment to enhance their firefighting skills within complex buildings.

Work started on 12 August on Kent Fire and Rescue Service’s real fire training facility (RFTF), on the land of the existing fire station in Henwood – which is also being remodelled but will remain fully operational throughout the build.

“We’re incredibly excited to get this redevelopment underway having worked closely with firefighting industry experts, Ashford Borough Council, and other leaders in this field to get this right. We’ve also consulted with nearby businesses and residents to seek feedback and to make sure we continue to work responsibly with the local community. Work started on site this week, with Morgan Sindall delivering the construction of this innovative project. 

Ann Millington, Chief Executive at Kent Fire and Rescue Service.

The development comes following the Grenfell Tower fire, from which all UK fire services are learning and striving to enhance firefighter skills surrounding challenging buildings. Once complete, the RFTF will simulate realistic scenarios in a high-rise environment, with real flames, providing crews with valuable experience and knowledge.

The high-tech training capability will help to enhance the skills of firefighters now and for the future, with a focus on sustainability across the whole project. Features include a specialist smoke filtration and extraction system on the live fire training building, and rainwater harvesting across the site to be used during training exercises.

“The development is significantly important to us, and it’s essential to further boost the skills of our firefighters so they’re even more prepared and highly competent when responding to fires in really challenging buildings. We can only hope we never see a fire like Grenfell Tower ever again, but with enhanced theoretical and practical training already embedded at KFRS, and the introduction of realistic exercises in our new real fire training facility, all our crews will be prepared and the best they can be at an enhanced level for a significant fire like that.”

Ann Millington, Chief Executive at Kent Fire and Rescue Service.

“This project is about future proofing our operational workforce through high quality training around complex properties and evolving building design, but it also demonstrates our commitment to creating a sustainable and efficient site, with many environmentally friendly features purposely weaved into the design.” 

Guy Hannell, Morgan Sindall Construction’s Southern Home Counties Area Director, said: “Kent Fire and Rescue Service’s (KFRS) new facility will be a fantastic example of a space that meets the challenging demands of the fire service in an innovative and sustainable manner. This has been possible thanks to the ambition of KFRS and a collaborative, Intelligent Solutions-led approach to delivering an on-budget, high-end environment tailored to the service’s needs.” 

“Supporting our emergency services with world-class training facilities showcases the connection between the construction industry and local communities, while demonstrating the effectiveness of strong public/private partnerships. The importance of fire training facilities is never lost on our team, who are dedicated to creating the best possible built solutions to assist the training and upskilling of service personnel.” 


To read similar articles, check out our Sustainability channel.

Fire Kent Fire and Rescue Kent FRS Sustainability
Share. LinkedIn Twitter Facebook Email

Stay informed

Sign up for our weekly newsletter with news, views and more.

Published by
Ninteen
Quick links
  • Privacy Policy
  • Cookie policy
  • About
  • Back issues
  • Contributors
  • Contact
In assocation with
The Emergency Services Show
The Emergency Tech Show
Certifications
The Emergency Tech Show
LinkedIn Instagram
  • Privacy Policy
  • Cookie policy
  • About
  • Back issues
  • Contributors
  • Contact
© 2026 Emergency Services Times.

Type above and press Enter to search. Press Esc to cancel.

Login